Cascade Rail Foundation’s Station Sign Project team is gearing up for a busy year in 2025.

Since 2020, our volunteers have been fabricating and installing three-quarter size replica Milwaukee Road style station signs at their historic locations along the Palouse to Cascades State Park Trail. To date, CRF has installed 24 new station signs from Boylston to the Idaho state line, including six along the portion of the trail within the US Army Yakima Training Center.

We’ve expanded the scope of the project to include additional locations along the rest of the trail, including replacement of some of the existing signs between Cedar Falls and Keechelus. Those signs were installed by Dan Brady, who is playing a key role in this project.

This year our volunteers installed signs at Malden, Rosalia, and Swan. The station sign at Malden was installed on Friday, October 4th. A certificate from Cascade Rail Foundation was presented to the mayor, dedicating the sign to the memory of Milwaukee railroaders and their families of Malden and also to the victims of the 2020 Babb Road Fire.

We have recently received permission from Washington State Parks to install or replace 16 more station signs and plan to complete those in 2025. 

The sign at Kenova is also approved, but installation is awaiting bridge repairs and reopening.

We plan to install signs east of Cle Elum in late May. Then the signs near Snoqualmie Pass will be installed after the snow melts, in June 2025 or later.

State Parks is reviewing our proposals to install five new or replacement signs between Cedar Falls and Rockdale, and signs at Roxboro and Servia between Warden and Lind. 

A full list of the signs and their status can be found below.

The replica Carlmar station sign installed at Carlmar.

You can help!

Donations in any amount are welcome to help us pay for materials.

A specific sign and location can be sponsored for $500, which is tax-deductible. A customized certificate of sponsorship will be provided, which includes, if possible, a photograph of the location from Milwaukee Road days, as well as a photograph of the installed sign and brief description of location. This is a positive way to remember and preserve the history of the Milwaukee Road, recognizing the communities and locations on the former mainline.

You can use the donation page on the website here. Be sure to check the box for the Station Sign project at the bottom of the form.

Or contributions can be mailed to Cascade Rail Foundation at:

PO Box 462
South Cle Elum, WA  98943

For comments, questions, and information, including specific location sponsorship, please contact us here

Mark Borleske holding an hand drawn sign that says "Roxboro" showing the location of the future Roxboro station sign

Mark Borleske showing the location of the future Roxboro station sign

 

Sign locations and installation status

The full list of signs is below. The mileposts measure the distance from Chicago on the railroad.

STATION MILEPOST  STATUS
Ragnar 2133.8 Replacement sign, pending State Parks approval
Garcia 2128.4 Replacement sign, pending State Parks approval
Minot 2126.8 New sign installation, pending State Parks approval
Bandera 2122.8 Replacement sign, pending State Parks approval
Rockdale 2118.2 New sign installation, pending State Parks approval
Keechelus 2109.0 Replacement in 2025
Meadow Creek 2108.5 Replacement in 2025
Whittier 2106.6 Replacement in 2025
Easton 2097.2 Installation in 2025
Lavender 2093.5 Installation in 2025
Horlick 2075.6 Installation in 2025
Taneum 2070.0 Installation in 2025
Thorp 2067.7 Installation in 2025
Woldale 2064.2 Installation in 2025
Regal 2056.5 Installation in 2025
East Kittitas 2051.4 Installation in 2025
Renslow 2049.0 Installation in 2025
Boylston 2044.2 Installed 2022
Cheviot 2040.5 Installed 2022
Rye 2037.2 Installed 2022
Doris 2031.6 Installed 2022
Cohassett 2028.2 Installed 2022
Beverly Jct. 2026.4 Installed 2022
Beverly 2056.6 Installation in 2025
Jericho 2018.8 Installation in 2025
Smyrna 2012.5 Installation in 2025
Roxboro 1964.4 New sign installation, pending State Parks approval
Servia 1959.3 New sign installation, pending State Parks approval
Lind 1951.0 Installed 2020
Vassar 1946.3 Installed 2022
Pizarro 1941.8 Installed 2022
Ralston 1936.5 Installed 2020
Marengo 1926.9 Installed 2022
Carlmar 1923.5 Installed 2022
Paxton 1916.7 Installed 2022
Revere 1912.4 Installed 2020
Kenova 1887.7 New sign approved, waiting for repairs to bridges and trailhead
Pine City 1885.7 Installed 2022
Malden 1882.1 installed 2024
Rosalia 1872.6 installed 2024
Williams 1868.8 Installed 2022
Pandora 1865.5 Replacement in 2025
Swan 1862.5 Installed 2024
Seabury 1859.9 Installed 2022
Lone Pine 1856.3 Installed 2022
Tekoa 1852.2 Installed 2022
Wallner 1849.5 Installed 2022